We co√∂rdineerden de identificatie van de technische en ATC-vereisten vanuit het ATC-perspectief. 

The Dutch airspace vision states the governments ambitions for the development of the airspace in the Netherlands.  One integral part is de development of Lelystad airport from a local airport serving recreational and training flights to an airport for commercial airline traffic.  This necessitates development of ATC Aerodrome Control Services including a fully functioning ATC tower at Lelystad airport.  MovingDot, together with ADSE, developed the system-support environment requirements for the ATC tower, including the environmental requirements in the operational rooms.  A number of environmental specifications where set up, including climate control (temperature and humidity), noise levels, visibility limits, and sun & glare protection.  Additionally, the associated requirements on the physical structure were also developed, including specifications for power supply, data & information technology, cables, water, emergency power supply, fire and emergency facilities, lightening protection, and protective grounding of power and ITC equipment. 

MovingDot had de leiding over het project. We co√∂rdineerden de identificatie van de technische en ATC-vereisten vanuit het ATC-perspectief. Samen met ADSE hebben we het bijbehorend requirements document voor LVNL opgesteld.