Projects

Implementation assistance of European Union (EU) Aeronautical Data Quality (ADQ) regulation 73/2010

Implementation assistance of European Union (EU) Aeronautical Data Quality (ADQ) regulation 73/2010

Assist in exploring the impact of the EU ADQ regulation on Dutch airports, finding the gaps in current processes and procedures, and defining a step-by-step approach for implementation.

view this project

Develop and implement a Quality and Safety Management System

Develop and implement a Quality and Safety Management System

Support DC-ANSP in the development and implementation of a quality and safety management system, consisting of a systematic approach to manage safety and quality, the necessary organizational structures, accountabilities, policies and procedures.

view this project

Risk identification of taxi operations at Amsterdam Airport Schiphol

Risk identification of taxi operations at Amsterdam Airport Schiphol

Risk identification of taxi operations at Amsterdam Airport Schiphol

view this project

Compliance check of Area Control Operations Manual with ICAO and EU SERA regulations

Compliance check of Area Control Operations Manual with ICAO and EU SERA regulations

LVNL is required to demonstrate compliance of its operations with applicable Dutch law and regulations. This includes adhering to ATM standards set forth in ICAO and EU documents pertaining to the provision of air traffic services. Verifying compliance requires the systematic review of investigating processes, practises and documentation.

view this project

Develop growth scenario’s for the development of Bonaire International Airport

Develop growth scenario’s for the development of Bonaire International Airport

Explore the market potential of Bonaire International Airport and the corresponding development options for the airport infrastructure.

view this project

SESAR research; Accelerating European Air Traffic Management (ATM) changes through regional forerunners

SESAR research; Accelerating European Air Traffic Management (ATM) changes through regional forerunners

Long Term SESAR project ACCHANGE objective was to explore innovative ways to accelerate change in European ATM: Accelerating European Air Traffic Management (ATM) changes through regional forerunners.

view this project

Analysis of an ILS cat.1 approach on Zürich Airport

Analysis of an ILS cat.1 approach on Zürich Airport

MovingDot studied possibilities for an ILS cat1 approach for runway 10 at Zürich Airport. Determination of protection areas and obstacle clearance altitude were included.

view this project

Procedure design for Air Traffic Control the Netherlands (LVNL)

Procedure design for Air Traffic Control the Netherlands (LVNL)

MovingDot experts assist the LVNL Procedure Development department in their design, development and maintenance of ATC-related procedures.

view this project

Navigation Capabilities of Aircraft at Schiphol

Navigation Capabilities of Aircraft at Schiphol

Investigation into the capabilities of airlines operating to/from Schiphol airport with regard to RNAV approach and departure procedures.

view this project